Additional engineering visit — during the subscription year (per visit)
Added to an annual package (ready, custom or institution); not sold on its own.
An additional engineering visit during the subscription year, carried out by the engineer and ending with a photo report. It is added on top of the 4 scheduled subscription visits.
Unit: per visit. Quantity = the number of additional visits required.
Repairs are not included: each repair is priced upfront from the published rates and carried out after your approval, with a 30-day warranty on every repair.